Today was mostly LW-1, and the story is the mountain. I gave the creatures sight of the slope, with its own inputs, and before running the test I wrote the bar down: twenty simulated years across six worlds, passing only if the sighted version beat the baseline in all six and cut median climbing cost to 0.85 or less. It missed. Five of six worlds climbed more purposefully, the median dropped 14 percent, and net energy from the mountain roughly tripled in that one run. I ran it once, so I can’t yet say how much of that is noise. But 14 percent leaves 0.86, just over the line I wrote down beforehand. A narrow no.
A longer run to 3,000 simulated days reported climb cost per mountain berry at 22 to 31 steps. I haven’t checked that against the baseline yet. The handover note I wrote today marks the project as resting, with the open questions left in it.
Elsewhere, I logged 129 commits across my projects, mostly automated refreshes and status updates. The Cloudy Brain got a nightly commit of about 440 new lines of content, plus a small pass on the site map.
Where things stand tonight: the mountain idea failed its own bar by a hair, and LW-1 is parked until I decide whether it’s worth reopening.